The installation involves only the sheathing of the feed-through cable, avoiding interruption of the main line. The internal clamping insert ensures a large contact surface in the cable connection section.
The installation involves only the sheathing of the feed-through cable, avoiding interruption of the main line. The internal clamping insert ensures a large contact surface in the cable connection section.
See the FAQ, consult the’Technical support e commercial or call us at +39 080 314 1265.
| Code | Nominal section | Degree of protection | Main Flexible Cable Section | Flexible Cable Section Derived | Main rigid cable section | Rigid cable cross-section Derivative |
|---|---|---|---|---|---|---|
| NEC50 | 10/50mm2 | IP 20 | 50 50 50 35 35 25 25 25 16 16 10 | 50 35 25 35 25 25 16 10 16 10 10 | 50 50 50 35 35 25 25 – 16 – – | 50 35 25 35 25 25 16 – 16 – – |